diff options
| author | Peter Stone <thepeterstone@gmail.com> | 2026-09-03 02:34:25 +0000 |
|---|---|---|
| committer | Peter Stone <thepeterstone@gmail.com> | 2026-09-03 02:34:25 +0000 |
| commit | 1477ee531045388de9e7e797200e5cd14e4a6d0e (patch) | |
| tree | b5369768ed0da759d492fda7957ab25833759d78 /migrations | |
| parent | 699e31989e2c36513e02861f49672f8984ffe336 (diff) | |
Make the day's list a pull of committed work, not a push of everything unblocked
due_date had been carrying two incompatible meanings: "this has a real
deadline" (Bills, meds, a signup cutoff) and "this is when I intend to
work on it." Chains leaned entirely on the second -- every step was
stamped due_date = now the moment it unlocked -- so a five-minute call
and a six-month certification both arrived looking overdue, and the only
way to quiet them was to hand-reschedule. The list therefore always
contained work that could not be finished that day, which made ending a
day at zero impossible by construction rather than by effort.
Splits the two apart:
- due_date keeps only its real meaning: an externally-imposed deadline.
- committed_date (new, migration 031) means "I chose this for today."
Chain steps no longer get a due date on unlock (CreateChain, advanceChain,
and the delete-promotion path), and are excluded from the undated list so
they don't simply fall through to it instead. They reach the day only by
being committed, via a "+ today" control on the chain card. Bucket-active
items get the same control. BuildTimeline pulls in committed tasks,
deduped against tasks already present for a different reason (committed
and due-today are two reasons for one row, not two rows).
Migration 031 also clears the auto-stamped due dates from open chain
steps; completed steps keep theirs as historical record.
Two supporting changes made while in here:
- Extracted the native_tasks SELECT list into nativeTaskColumns. It had
been copy-pasted into nine queries that must each agree exactly with
scanNativeTasks' field order; adding committed_date meant editing all
nine correctly or silently breaking whichever was missed.
- Extracted templateFuncMap() and added TestTemplates_AllParse. New()
only logs a warning when template parsing fails, so a malformed
template shipped silently and surfaced as a broken page at runtime.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_018AwnALZL6bD4VBtATDVv3B
Diffstat (limited to 'migrations')
| -rw-r--r-- | migrations/031_task_commitment.sql | 23 |
1 files changed, 23 insertions, 0 deletions
diff --git a/migrations/031_task_commitment.sql b/migrations/031_task_commitment.sql new file mode 100644 index 0000000..383695b --- /dev/null +++ b/migrations/031_task_commitment.sql @@ -0,0 +1,23 @@ +-- Splits the two jobs `due_date` had been doing at once. +-- +-- `due_date` had meant both "this has an externally-imposed deadline" (Bills, +-- meds, a signup cutoff) and "this is when I intend to work on it." Chains +-- leaned entirely on the second reading: every step was stamped due_date = now +-- the moment it unlocked, so a five-minute phone call and a six-month +-- certification both arrived looking overdue, and the only way to quiet them was +-- to hand-reschedule -- which is what had been happening. +-- +-- After this, due_date keeps only its first meaning, and committed_date carries +-- the second: "I chose to do this today." The day's list is then a pull of what +-- was committed plus genuine deadlines, rather than a push of everything not +-- blocked -- which is what makes finishing a day at zero possible at all. +ALTER TABLE native_tasks ADD COLUMN committed_date DATE; + +-- Chain steps were given their due date by the machinery described above, not by +-- any real deadline, so clear it on open steps. Completed steps keep theirs as +-- historical record. +UPDATE native_tasks +SET due_date = NULL +WHERE completed = 0 + AND chain_id IS NOT NULL + AND chain_id != ''; |
