summaryrefslogtreecommitdiff
path: root/internal/models/types.go
diff options
context:
space:
mode:
authorPeter Stone <thepeterstone@gmail.com>2026-09-03 02:34:25 +0000
committerPeter Stone <thepeterstone@gmail.com>2026-09-03 02:34:25 +0000
commit1477ee531045388de9e7e797200e5cd14e4a6d0e (patch)
treeb5369768ed0da759d492fda7957ab25833759d78 /internal/models/types.go
parent699e31989e2c36513e02861f49672f8984ffe336 (diff)
Make the day's list a pull of committed work, not a push of everything unblocked
due_date had been carrying two incompatible meanings: "this has a real deadline" (Bills, meds, a signup cutoff) and "this is when I intend to work on it." Chains leaned entirely on the second -- every step was stamped due_date = now the moment it unlocked -- so a five-minute call and a six-month certification both arrived looking overdue, and the only way to quiet them was to hand-reschedule. The list therefore always contained work that could not be finished that day, which made ending a day at zero impossible by construction rather than by effort. Splits the two apart: - due_date keeps only its real meaning: an externally-imposed deadline. - committed_date (new, migration 031) means "I chose this for today." Chain steps no longer get a due date on unlock (CreateChain, advanceChain, and the delete-promotion path), and are excluded from the undated list so they don't simply fall through to it instead. They reach the day only by being committed, via a "+ today" control on the chain card. Bucket-active items get the same control. BuildTimeline pulls in committed tasks, deduped against tasks already present for a different reason (committed and due-today are two reasons for one row, not two rows). Migration 031 also clears the auto-stamped due dates from open chain steps; completed steps keep theirs as historical record. Two supporting changes made while in here: - Extracted the native_tasks SELECT list into nativeTaskColumns. It had been copy-pasted into nine queries that must each agree exactly with scanNativeTasks' field order; adding committed_date meant editing all nine correctly or silently breaking whichever was missed. - Extracted templateFuncMap() and added TestTemplates_AllParse. New() only logs a warning when template parsing fails, so a malformed template shipped silently and surfaced as a broken page at runtime. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_018AwnALZL6bD4VBtATDVv3B
Diffstat (limited to 'internal/models/types.go')
-rw-r--r--internal/models/types.go7
1 files changed, 7 insertions, 0 deletions
diff --git a/internal/models/types.go b/internal/models/types.go
index 41ba162..1decd93 100644
--- a/internal/models/types.go
+++ b/internal/models/types.go
@@ -29,6 +29,13 @@ type Task struct {
RecurrenceSeriesID string `json:"recurrence_series_id,omitempty"`
NextOccurrenceOverride *time.Time `json:"next_occurrence_override,omitempty"`
+ // CommittedDate is "I chose to do this on this day," deliberately distinct
+ // from DueDate, which after migration 031 means only an externally-imposed
+ // deadline. The day's list is a pull of committed work plus real deadlines,
+ // rather than a push of everything unblocked -- which is what makes ending a
+ // day at zero possible.
+ CommittedDate *time.Time `json:"committed_date,omitempty"`
+
// Chain membership (doot-native tasks only). ChainID != "" is the
// indicator that a task belongs to a linear task chain.
ChainID string `json:"chain_id,omitempty"`