| Age | Commit message (Collapse) | Author |
|
HandleWidgetTaskUpdate now returns 404 instead of silently succeeding
when the widget's cached task id no longer exists, matching every
other native_tasks mutator's checkRowsAffected pattern.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
A recurring task's successor now also gets created once its due date
passes, independent of completion -- an ignored/overdue recurring task
no longer blocks the next occurrence from appearing. Runs every 15
minutes via a new goroutine in main.go, cancelled on shutdown.
|
|
CompleteNativeTask now creates a new row for the next occurrence when
completing the latest iteration of a recurring series (using the
one-shot next_occurrence_override if set, else ComputeNextOccurrence).
Completing an already-superseded row (the periodic due-check beat it
to creating the successor) just marks it completed, no double-create.
|
|
recurrence_series_id != "" is the real recurring indicator (IsRecurring
predates this feature and is never set). Adds parseWeekdays/formatWeekdays
for the comma-separated weekday-list column, and threads the five new
columns through scanNativeTasks and all four existing SELECT queries.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
Another session pushed 27 commits in parallel covering quick-add, event
detail popups, recurrence display, overdue badges, a manual refresh button,
and its own fix for the same overdue-tasks bug (via a separate
GetOverdueNativeTasks fetch folded into BuildTimeline, rather than widening
GetNativeTasksByDateRange's bound directly). Reconciled rather than blindly
taking one side:
- Reverted GetNativeTasksByDateRange to its original bounded query and kept
upstream's GetOverdueNativeTasks + BuildTimeline fold-in as the sole
overdue mechanism for native tasks, to avoid double-counting overdue
items (my widened query + their separate fetch would have both returned
them). Re-pointed the regression test at the now-correct contract and
added a store-level test for GetOverdueNativeTasks directly.
- Kept my GetGoogleTasksByDateRange fix as-is (single unbounded query) --
upstream never touched Google Tasks overdue handling, so there's no
duplication risk there.
- Rewove WidgetRoot's LazyColumn structure (added for scrolling) around
upstream's new header buttons, pinned all-day event rows, and the
enhanced TomorrowSection, none of which were written LazyColumn-aware
since that work landed on this side only.
- Combined both sides' additions to TaskDetailActivity/TaskDetailSheet
(description-edit detail popup + due-date reschedule label) and
WidgetRepository/Actions (optimistic local removal + refresh button
wiring) -- these were independent, non-overlapping features that both
needed to survive.
- Renumbered the migration collision: both sides independently added a
migration numbered 022. Card-description was already applied to the live
production DB under that filename earlier this session (migrations are
tracked by filename), so it keeps 022; the recurring-event-id migration,
never deployed under any name here, moves to 023.
Verified: go build clean, full test suite passes (only the two
pre-existing agent-handler failures and the pre-existing models package
build error remain, both confirmed unrelated via git stash before this
session began), and a dry run against a copy of the live production
database applies both migrations cleanly with no re-run conflicts.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01EZ7ikw2ukGJFTHE3bJS7zL
|
|
- Add description editing to the widget's task detail popup for
doot/gtasks/trello, backed by new GET /api/widget/detail and
POST /api/widget/update endpoints
- Make Google Tasks and Trello cards completable via the widget (Trello
completion archives the card); fix Trello description never being
fetched, which meant saving could silently wipe a card's real desc
- Fix google_tasks.due_date/updated_at (TEXT columns) never round-tripping
through sql.NullTime, which broke cached Google Tasks reads whenever
the cache was valid
- Fix native-task and Google-Task date-range queries excluding anything
due before the window start, which dropped incomplete tasks off the
widget the moment their due day passed (the "overdue tasks disappeared"
bug)
- Fix native task description edits blanking the task's title
- Make the widget's day list scroll (LazyColumn) instead of clipping
- Optimistically remove a task from the widget immediately on completion,
ahead of the authoritative background refresh
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01EZ7ikw2ukGJFTHE3bJS7zL
|
|
GetNativeTasksByDateRange's SQL bound (due_date >= start) excluded any
task overdue from a previous day before ComputeDaySection ever got a
chance to mark it IsOverdue, so both the web Timeline view and the
widget API (which both call BuildTimeline with start = today) silently
dropped overdue tasks entirely -- only the Tasks tab (unbounded
GetNativeTasks) showed them. Added GetOverdueNativeTasks and folded its
results into BuildTimeline alongside the ranged fetch.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
CompleteNativeTask/UncompleteNativeTask/RescheduleNativeTask ran a plain
UPDATE ... WHERE id = ? and returned whatever error Exec gave back --
which is nil even when 0 rows match, since that's not a SQL error. A
stale or wrong id from the widget looked identical to a real completion:
HTTP 200, nothing changed in the database. Real incident: 1 of 3 widget
completeTask taps silently no-opped this way.
Now checks RowsAffected() and returns ErrNativeTaskNotFound (mirrors the
existing pattern in sqlite.go's ApproveAgentSession/DenyAgentSession).
HandleWidgetComplete and HandleWidgetReschedule surface this as 404
instead of a fake 200, so the widget can tell 'nothing changed' apart
from 'it worked.'
|
|
Native tasks (native_tasks table) fully replace Todoist. All Todoist
API code, store functions, handlers, routes, templates, and tests have
been removed. Migration 021 drops the now-unused tasks cache table.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Tapping a doot task shows a date picker. On confirm, POSTs to
/api/widget/reschedule, updates due_date in native_tasks, refreshes
widget. Reschedule button only shows for source="doot" tasks.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Adds doot-owned task storage (native_tasks table) so tasks can be
managed without Todoist. CompleteTask for 'doot' source just updates
the DB — no external API call, no token dependency.
Migration path:
POST /settings/import-from-todoist — copies Todoist cache → native_tasks
Then remove TODOIST_TOKEN from .env to disable Todoist
Changes:
- migration 020: native_tasks table
- store: GetNativeTasks, GetNativeTasksByDateRange, GetUndatedNativeTasks,
CreateNativeTask, CompleteNativeTask, UncompleteNativeTask,
UpdateNativeTask, ImportFromTodoist
- timeline: native tasks appear as source="doot" (teal)
- handleAtomToggle: "doot" case — no external API needed
- HandleWidgetComplete: method on Handler, handles "doot" natively
- HandleUnifiedAdd: "doot" source creates in native_tasks
- widget: "doot" tasks are completable, teal color indicator
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|