| Age | Commit message (Collapse) | Author |
|
Wires ComputeBudgetPeriod together with availability blocks, tracked
project/label sets, calendar events, and native tasks into a new
computeBudgetStatus helper on *Handler. HandleWidgetGet now populates
WidgetResponse.BudgetStatus with today/week periods, but only when at
least one incomplete budget-tracked task exists in the rolling week
window -- otherwise the field is omitted entirely so unconfigured users
see no new UI. Errors are logged and swallowed, matching the existing
resilience pattern for this widget endpoint.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01PQaPGQVSfmKUiHXB87qRTC
|
|
Tests verify ProjectColor is populated in BuildTimeline and copied to WidgetItem.
|
|
Tests for HandleWidgetProjectsGet, HandleWidgetProjectsCreate,
HandleWidgetTaskProject, HandleWidgetTaskLabels, HandleWidgetLabelsGet,
HandleWidgetLabelsColorSet, and the extended HandleWidgetTaskDetail
response with project and labels fields.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
HandleWidgetTaskUpdate now returns 404 instead of silently succeeding
when the widget's cached task id no longer exists, matching every
other native_tasks mutator's checkRowsAffected pattern.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
GET /api/widget/task, POST /api/widget/task/update,
POST /api/widget/task/recurrence, POST /api/widget/task/next-date.
Doot-only; the recurrence/next-date fields are null in the detail
response for a non-recurring task.
|
|
A genuine all-day Google Calendar event spanning multiple days (e.g. a
3-day conference) never got its EndTime forwarded to the widget client,
since the conversion only set End when !IsAllDay. The client has no way
to detect a multi-day span without both Start and End.
|
|
Tapping a calendar event (or any event-type item) now opens the event's
URL (Google Calendar, Plan to Eat, etc.) directly instead of showing an
intermediate popup with an "Open in Calendar" button. Removes
EventDetailActivity and the recurrence-schedule lookup it was the only
consumer of: WidgetRepository.getRecurrence, the Go
/api/widget/recurrence endpoint, HandleWidgetRecurrence,
GoogleCalendarAPI.GetRecurrenceRule, and formatRecurrence, plus their
tests. RecurringEventID itself stays -- it's general calendar-sync
metadata used elsewhere in the timeline pipeline, not exclusive to the
removed popup.
|
|
Another session pushed 27 commits in parallel covering quick-add, event
detail popups, recurrence display, overdue badges, a manual refresh button,
and its own fix for the same overdue-tasks bug (via a separate
GetOverdueNativeTasks fetch folded into BuildTimeline, rather than widening
GetNativeTasksByDateRange's bound directly). Reconciled rather than blindly
taking one side:
- Reverted GetNativeTasksByDateRange to its original bounded query and kept
upstream's GetOverdueNativeTasks + BuildTimeline fold-in as the sole
overdue mechanism for native tasks, to avoid double-counting overdue
items (my widened query + their separate fetch would have both returned
them). Re-pointed the regression test at the now-correct contract and
added a store-level test for GetOverdueNativeTasks directly.
- Kept my GetGoogleTasksByDateRange fix as-is (single unbounded query) --
upstream never touched Google Tasks overdue handling, so there's no
duplication risk there.
- Rewove WidgetRoot's LazyColumn structure (added for scrolling) around
upstream's new header buttons, pinned all-day event rows, and the
enhanced TomorrowSection, none of which were written LazyColumn-aware
since that work landed on this side only.
- Combined both sides' additions to TaskDetailActivity/TaskDetailSheet
(description-edit detail popup + due-date reschedule label) and
WidgetRepository/Actions (optimistic local removal + refresh button
wiring) -- these were independent, non-overlapping features that both
needed to survive.
- Renumbered the migration collision: both sides independently added a
migration numbered 022. Card-description was already applied to the live
production DB under that filename earlier this session (migrations are
tracked by filename), so it keeps 022; the recurring-event-id migration,
never deployed under any name here, moves to 023.
Verified: go build clean, full test suite passes (only the two
pre-existing agent-handler failures and the pre-existing models package
build error remain, both confirmed unrelated via git stash before this
session began), and a dry run against a copy of the live production
database applies both migrations cleanly with no re-run conflicts.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01EZ7ikw2ukGJFTHE3bJS7zL
|
|
- Add description editing to the widget's task detail popup for
doot/gtasks/trello, backed by new GET /api/widget/detail and
POST /api/widget/update endpoints
- Make Google Tasks and Trello cards completable via the widget (Trello
completion archives the card); fix Trello description never being
fetched, which meant saving could silently wipe a card's real desc
- Fix google_tasks.due_date/updated_at (TEXT columns) never round-tripping
through sql.NullTime, which broke cached Google Tasks reads whenever
the cache was valid
- Fix native-task and Google-Task date-range queries excluding anything
due before the window start, which dropped incomplete tasks off the
widget the moment their due day passed (the "overdue tasks disappeared"
bug)
- Fix native task description edits blanking the task's title
- Make the widget's day list scroll (LazyColumn) instead of clipping
- Optimistically remove a task from the widget immediately on completion,
ahead of the authoritative background refresh
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01EZ7ikw2ukGJFTHE3bJS7zL
|
|
|
|
|
|
|
|
|
|
|
|
WidgetItem.isAllDay was carried by the client's data model but nothing
ever read it. All-day events had no Start at all, so they fell into the
same floating-task queue as ordinary untimed tasks; if enough tasks were
ahead of one in the queue, SlotPacker could assign it an hour slot past
the visible grid range entirely -- not merely unpinned, actually
invisible.
Server: TimelineItemToWidgetItem now populates Start for all-day
CALENDAR EVENTS specifically (their real event date), while leaving
undated doot/gtask tasks -- also flagged IsAllDay as a "no specific
time" fallback, a different concept -- on the existing nil-Start
floating behavior.
Client: all-day events are filtered out of the hourly grid/floating-task
pipeline entirely, bucketed by day using the new Start date, and
rendered in a new pinned AllDayRow section right after the TODAY/TOMORROW
headers.
|
|
CompleteNativeTask/UncompleteNativeTask/RescheduleNativeTask ran a plain
UPDATE ... WHERE id = ? and returned whatever error Exec gave back --
which is nil even when 0 rows match, since that's not a SQL error. A
stale or wrong id from the widget looked identical to a real completion:
HTTP 200, nothing changed in the database. Real incident: 1 of 3 widget
completeTask taps silently no-opped this way.
Now checks RowsAffected() and returns ErrNativeTaskNotFound (mirrors the
existing pattern in sqlite.go's ApproveAgentSession/DenyAgentSession).
HandleWidgetComplete and HandleWidgetReschedule surface this as 404
instead of a fake 200, so the widget can tell 'nothing changed' apart
from 'it worked.'
|
|
Native tasks (native_tasks table) fully replace Todoist. All Todoist
API code, store functions, handlers, routes, templates, and tests have
been removed. Migration 021 drops the now-unused tasks cache table.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Bug 1: BuildUnifiedAtomList never called GetNativeTasks(), so doot-sourced
tasks were absent from the web Tasks tab. Added GetNativeTasks() fetch and
NativeTaskToAtom conversion (new model helper, SourceDoot constant).
Bug 2: handleAtomToggle called getAtomDetails after CompleteNativeTask, but
GetNativeTasks filters WHERE completed=0, so the task was already gone and
the title came back blank. Moved getAtomDetails call to before the completion
switch so all sources (including doot) capture title/dueDate first.
Also fixed widget_test.go compile error: TestHandleWidgetComplete_NonTodoist
called HandleWidgetComplete as a package-level function but it is a method on
*Handler. Rewrote the file as package handlers (internal) and construct
&Handler{} directly.
Regression tests added for both bugs in atoms_test.go and handlers_test.go.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Implements WidgetAuthMiddleware (static bearer token), TimelineItemToWidgetItem
(conversion helper), HandleWidgetGet (today's items as JSON), and
HandleWidgetComplete (proxies task completion to Todoist).
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|