| Age | Commit message (Collapse) | Author |
|
|
|
|
|
|
|
|
|
|
|
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
|
|
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
GetNativeTasksByDateRange's SQL bound (due_date >= start) excluded any
task overdue from a previous day before ComputeDaySection ever got a
chance to mark it IsOverdue, so both the web Timeline view and the
widget API (which both call BuildTimeline with start = today) silently
dropped overdue tasks entirely -- only the Tasks tab (unbounded
GetNativeTasks) showed them. Added GetOverdueNativeTasks and folded its
results into BuildTimeline alongside the ranged fetch.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VTUSAEKfsPc6WGDq45yPHD
|
|
fetchCalendarEvents falls back to config.GoogleCalendarID whenever no
source_configs rows exist yet for the gcal source -- which is the
current live state (0 rows). GoogleCalendarID is a single env var that
itself holds a comma-separated list of calendar IDs, but the whole
joined string was being wrapped in a single-element []string{...} and
passed straight to SetCalendarIDs. Google's API takes one calendarId per
call, so every fetch failed with '404 Not Found' on the literal
comma-joined string -- confirmed live in production logs. This broke all
calendar events, in both the web dashboard and the widget, silently.
Now splits on commas and trims whitespace before use.
|
|
WidgetItem.isAllDay was carried by the client's data model but nothing
ever read it. All-day events had no Start at all, so they fell into the
same floating-task queue as ordinary untimed tasks; if enough tasks were
ahead of one in the queue, SlotPacker could assign it an hour slot past
the visible grid range entirely -- not merely unpinned, actually
invisible.
Server: TimelineItemToWidgetItem now populates Start for all-day
CALENDAR EVENTS specifically (their real event date), while leaving
undated doot/gtask tasks -- also flagged IsAllDay as a "no specific
time" fallback, a different concept -- on the existing nil-Start
floating behavior.
Client: all-day events are filtered out of the hourly grid/floating-task
pipeline entirely, bucketed by day using the new Start date, and
rendered in a new pinned AllDayRow section right after the TODAY/TOMORROW
headers.
|
|
CompleteWorker.enqueue used a plain WorkManager.enqueue(), which allows
unlimited concurrent OneTimeWorkRequests. A rapid double-tap on the same
row (plausible since the checkbox doesn't visually update until the full
async round-trip -- complete() -> fetchAndPersist() -> updateAll() --
finishes) could spawn two independent, unordered CompleteWorker runs for
the same task, each doing its own fetchAndPersist(); a second worker's
fetch started before the first worker's complete() call had actually
landed server-side could persist a stale snapshot after the first
worker's correct one.
Now uses enqueueUniqueWork("complete_$id", KEEP, ...) so a tap on a task
that already has a completion in flight is dropped rather than racing a
second worker. Different task ids remain independent.
|
|
CompleteNativeTask/UncompleteNativeTask/RescheduleNativeTask ran a plain
UPDATE ... WHERE id = ? and returned whatever error Exec gave back --
which is nil even when 0 rows match, since that's not a SQL error. A
stale or wrong id from the widget looked identical to a real completion:
HTTP 200, nothing changed in the database. Real incident: 1 of 3 widget
completeTask taps silently no-opped this way.
Now checks RowsAffected() and returns ErrNativeTaskNotFound (mirrors the
existing pattern in sqlite.go's ApproveAgentSession/DenyAgentSession).
HandleWidgetComplete and HandleWidgetReschedule surface this as 404
instead of a fake 200, so the widget can tell 'nothing changed' apart
from 'it worked.'
|
|
In Glance 1.1.0 (RemoteViews), a parent Row with .clickable() silently
overrides any nested child .clickable() — tapping the checkbox fired the
detail-open action instead of CompleteTaskAction, producing no visible
effect. Fix by splitting TaskRow into two sibling Boxes: a 24dp tap
target wrapping the checkbox icon (routes to CompleteTaskAction) and a
defaultWeight Box for the title (routes to actionStartActivity). No
nesting, so both actions are independently reachable.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Native tasks (native_tasks table) fully replace Todoist. All Todoist
API code, store functions, handlers, routes, templates, and tests have
been removed. Migration 021 drops the now-unused tasks cache table.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Both deploy scripts now run `npm ci || npm install && npm run build`
before syncing web/static/, ensuring Tailwind output.css is always
present in fresh checkouts.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Reconciles diverged histories: deploy/master had gateway proxy Host-header
and publicPaths fixes that were never synced back to local/github; this
branch had the native-task Tasks-tab/completion fix. Merging both.
|
|
Bug 1: BuildUnifiedAtomList never called GetNativeTasks(), so doot-sourced
tasks were absent from the web Tasks tab. Added GetNativeTasks() fetch and
NativeTaskToAtom conversion (new model helper, SourceDoot constant).
Bug 2: handleAtomToggle called getAtomDetails after CompleteNativeTask, but
GetNativeTasks filters WHERE completed=0, so the task was already gone and
the title came back blank. Moved getAtomDetails call to before the completion
switch so all sources (including doot) capture title/dueDate first.
Also fixed widget_test.go compile error: TestHandleWidgetComplete_NonTodoist
called HandleWidgetComplete as a package-level function but it is a method on
*Handler. Rewrote the file as package handlers (internal) and construct
&Handler{} directly.
Regression tests added for both bugs in atoms_test.go and handlers_test.go.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
DNS-rebinding check
mcp.NewStreamableHTTPHandler rejects requests where the server is
bound to loopback but the Host header is not (DNS-rebinding protection).
Requests proxied through doot arrived at claudomator with
Host: doot.terst.org, triggering a 403.
Set req.Host = target.Host in the ReverseProxy Director so upstream
services see the target host (e.g. 127.0.0.1:8484) rather than the
original public hostname.
|
|
Adds a publicPaths field to serviceMount alongside webhookPaths.
webhookPaths remains POST-only (HMAC-signed webhooks). publicPaths
bypasses session auth for all methods, relying on the upstream
service's own bearer-token auth instead.
Used to expose /claudomator/chatbot/mcp for MCP client connections
(claude-code) which carry their own Authorization header and cannot
carry a doot session cookie.
|
|
- Calendar: fall back to GOOGLE_CALENDAR_ID config when no source_configs
synced yet (fixes blank calendar after fresh deploy)
- Meals: call fetchMeals in HandleTimeline so PlanToEat cache refreshes
on every timeline load, not just during manual refresh
- Tomorrow section: replace calendar-grid with flat chronological list
matching widget layout (time label | source bar | title)
- Add /health endpoint (no auth required) for deploy health checks
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Widget now renders a TOMORROW block below the today grid: events with
inline time labels (slightly dimmed) and task rows. Separated by a
divider. Covers both explicit-start tomorrow items and slot-packed
fragments that overflow from today.
Web view: TODO comment to flatten the tomorrow section to match widget.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Tapping a doot task shows a date picker. On confirm, POSTs to
/api/widget/reschedule, updates due_date in native_tasks, refreshes
widget. Reschedule button only shows for source="doot" tasks.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
TODOIST_API_KEY is no longer required — native task management works
without it. Guards nil todoistClient in handleAtomToggle.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Adds doot-owned task storage (native_tasks table) so tasks can be
managed without Todoist. CompleteTask for 'doot' source just updates
the DB — no external API call, no token dependency.
Migration path:
POST /settings/import-from-todoist — copies Todoist cache → native_tasks
Then remove TODOIST_TOKEN from .env to disable Todoist
Changes:
- migration 020: native_tasks table
- store: GetNativeTasks, GetNativeTasksByDateRange, GetUndatedNativeTasks,
CreateNativeTask, CompleteNativeTask, UncompleteNativeTask,
UpdateNativeTask, ImportFromTodoist
- timeline: native tasks appear as source="doot" (teal)
- handleAtomToggle: "doot" case — no external API needed
- HandleWidgetComplete: method on Handler, handles "doot" natively
- HandleUnifiedAdd: "doot" source creates in native_tasks
- widget: "doot" tasks are completable, teal color indicator
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Replaces browser deep-link with a transparent TaskDetailActivity that
shows a Material3 ModalBottomSheet (20-40% screen height). The launcher
shows through the transparent window behind the dark scrim. Sheet shows
source color dot, task title, and Mark Complete button for Todoist tasks.
Tapping outside or swiping down dismisses. No browser involved.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
Adds GET /task?id=xxx&source=xxx route that renders a full mobile-friendly
task detail page (session-protected). Widget task rows now open this page
when tapped. HandleUpdateTask redirects back to the page after a non-HTMX
save. Android: threads serverUrl through composable chain to TaskRow.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
|
|
|
|
|
|
|
|
This reverts commit 4d332a89e503fb1568a6208d1ed5518e17131d55.
|
|
|
|
|
|
|
|
import in tests
|
|
SettingsActivity
|
|
|
|
|
|
|